Monthly Technology Walkthrough Logo
  • Monthly Technology Walkthrough

  • Restaurant Info

  • Updates

    Here are the latest and greatest updates. Please pay special attention to these as you complete this month's wakthrough!
  • 3/1 - Fun background. Adjusted reporting for 3PO

    12/24 - Report enhancements - Comprehensive rundown of walkthrough, OTP kickback

    12/18 - Added ePR-1, ePR-2 distinction in the kitchen area walkthrough

    12/14 - Kitchen Section equipment question enhancements with grading.  Added overall walkthrough score

    11/17 - Added Office and Supporting Systems equipment enhancements and scoring

    11/10 - Added question to check Squadle tablet camera app for pictures

    11/1 - Added need to submit picture for e*Production screens for correct product setting verification.

    10/1 - Removed Pre-Sell Board questions and added BDAP device number entry options. Added questions regarding network rack and back office recabling.

    9/29 - DT Cashier Section equipment question enhancements with grading

    9/22 - Added action item emails to Coordinators for all action items required when form is filled out.

    8/29 - Added CBB/BDAP/DT Present equipment enhancements

    8/28 - Added ABS 1.0 and 2.0 identifying pictures for OTP completed forms. Looking for CO2 pictures/identifiers.

    6/22 - Added question to exterior regarding reader board message.

    6/14 - Added OTP toggle to include ability to use the same form.

    6/8 - DT Present/CBB/BDAP Section - Added new question regarding danger zone and stacklane views missing if not all views are present question is marked "no".

    Removed question asking type of headsets in the restaurant.

    6/2 - Updated CO2 question to reference the MarkIV being out of compliance.  This unit needs to be replaced per NRBES.

     

  • Exterior Walkthrough

  • Dining Room Walkthrough

  • Kiosk 6

  • Kiosk 7

  • Kiosk 8

  • Kiosk 9

  • Kiosk 10

  • Front Counter Walkthrough

  • FC - 01

  • FC - 02

  • FC - 03

  • FC - 04

  • ABS 1.0

  • Image-330
  • ABS 2.0

  • Image-333
  • HLZ Walkthrough

  • KC-03

  • Dedicated Delivery Monitor

  • Front Counter Coffee Monitor

  • DT Present/CBB/BDAP Walkthrough

  • KC-04

  • DT - 14

  • DT - 15

  • ABS 1.0

  • Image-335
  • ABS 2.0

  • Image-337
  • DT Cash

  • DT - 12

  • DT - 13

  • Kitchen

  • KC-01

  • KC-02

  • LCM - Look and Cook Monitor

  • e*Production Monitors and Controllers

  • ePR-1 (UHC and Fry eProduction Monitors)

  • ePR-2 (Bake Monitor)

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please check in with the Kitchen Manager/GM to see if there are any eProduction changes that need to be made and add them to the action items.

  • Office

  • Supporting Systems Walkthrough

  • Technology Restaurant Scores

  • Please be sure to take necessary corrective actions to bring the restaurant back up to 100%.  For items needing approval, send any order requests immediately so we are able to get what is required taken care of.

  • Should be Empty: